The Hogan bridge
Written by The Bridge Lady (Regina)

Bridge Transformation

While we believe that it is always better to be humble, sometimes you earn the right to ‘toot your horn’ as the saying goes.  This is a story that we are very proud about from a number of perspectives.

A very successful and reputable construction company out of Connecticut – O & G, Inc. – asked us to come and look at a bridge they wanted to replace on the Torrington Golf Club in Goshen, CT.  Torrington is a beautiful golf club with a rich history, including hosting several major regional and national competitions.

The bridge in question was 20’ X 12’ and was used for equipment weighing up to 14,000 lbs.  O & G was donating the bridge to Torrington as a memorial bridge in honor of 3 deceased brothers who were founding partners of O & G and had spent many enjoyable days at Torrington GC.

After supplying an initial quote, we went to examine the old bridge – wood planks on 3 steel beams.  Based on our analysis of the bridge, we determined that the steel beams were in great shape and that we could reduce the cost considerably by incorporating these into the new design.

old bridge

The original bridge

The particular challenge presented to us was that O & G wanted something very special as a memorial bridge.  Working with our Design Team, O & G decided on a ‘Hogan’ style bridge which has an arched deck and ‘rubble’ stone fascia on each side.  We had to design and engineer a solution that arched the deck, accommodated Vehicular Live Loads of 14,000 lbs. and had a fascia on each side.

The solution started with making structural deck panels with progressively deeper beams to create the arched deck.  We custom fabricated 5 – 4’ panels, each the full width of the bridge, and these were attached to the steel beams to make the ‘structural-arched deck’.

Deck panels being fitted over the steel beams.

From there, we attached the ‘stone’ fascia to the deck beams and capped it with a curb.  The curbs on each side of the bridge deck have inscriptions denoting the memorial tribute that was the inspiration for the bridge.

 The finish product look like this Hogan Bridge. (We are waiting for a picture of the installed bridge at O & G Inc.)The Hogan Bridge

To anyone looking at this bridge, it appears to have a concrete deck, granite curbs and ‘rubble’ stone with mortar as a structural arch on the sides.  In reality, all of the components added to the steel beams that were retained were made of 100% fiberglass.

We started this story by telling you that our team was particularly proud about this project.  Let us close by telling you why:

  • Our association with the O & G and Torrington GC Teams – a more professional group of people would be hard to find. Their thoroughness and attention to detail made them a pleasure to work with.

  • Our efforts to help our client save money by retaining and re-using steel beams that have another 25+ years of useful life left in them. We credit our Design Team with engineering a method to create an arched deck on flat steel.

  • The final product is really a ‘work of art’ that will serve the members of the Torrington GC for many generations to come and provide a lasting tribute to the 3 deceased brothers who are honored with inscriptions on the bridge.

 

residentials bridge
Written by The Bridge Lady (Regina)

Bridge Stories

There is a story behind every bridge we have ever made. We like to share these bridge stories because we hope that you will find them interesting and will want to work with us to make your own ‘bridge story’.

There is no shortage of material for the Bridge Stories.  Every project involves some combination of people, places and challenges.  We have been fortunate to meet and deal with some outstanding people as we have taken on more and more bridge projects.

It has also given our team the opportunity to do business in many interesting places in North America.  This is its own learning experience and it has a value that is hard to measure.

On the technical side, our business is committed to innovation.  This means our engineers and technicians are always be dealing with new ‘first-time’ challenges.  That’s a good thing.  It pushes all of us to constantly learn and improve and it makes us all better for it.

These ‘bridge stories’ sometimes intentionally omit names of people and their organizations.  This is out of respect for the privacy interests of our valued customers.

branding
Written by The Bridge Lady (Regina)

‘Branding’

This bridge story is an illustration of how you can use the bridge as one more tool to promote your brand.  It’s not a long story but there is an important message that might be useful for some.

Links Bridges was contracted by The Marshes Golf Club to provide a replacement for a wood bridge that had suffered the fate that eventually befalls all wood bridges – rotten deck and rotten beams.

The Marshes is a prestigious public course in Canada’s capital city – Ottawa.  The Marshes sits in the midst of high rise buildings with millions of square feet of high end office space.  A luxury hotel – The Brookstreet is part of the property.

The Marshes, office buildings – which house numerous world leading technology companies – and golf course are under common ownership.  The golf course was designed by world-renowned architect Robert Trent Jones Sr.

The bridge was a simple enough project – 50’ long X 6’ wide in a wood finish.  They chose the flat ‘Timber’ model because the bridge is set in a bit of gulley and spans one of the many wetlands that gives The Marshes its name.

One of the features that Links Bridges uniquely offers is for logos to be incorporated on to the decks of bridges.  These are actually done with a laser process that results in a ‘negatively’ embossed logo on the deck.  The significance of this is that it means the logo lasts forever – like the bridge.  It won’t fade and weaken over time.  Faded logos do a great disservice to a brand as they convey the wrong message.

The Marshes took advantage of the opportunity presented by the new bridge to place not only The Marshes logo on one end but also the logo for The Brookstreet Hotel.  This is a clever means of ‘linking’ the brands and reminding golfers that the hotel and its many amenities are integral to the golf property.

brandingMarshees

Two ends of the same bridge showing different logos – the distinctive The Marshes Logo with its red-wing blackbird and The Brookstreet Hotel with its stylized ‘B’.

The main point of this bridge story is that good organizations recognize the value and importance of promoting their ‘brand’.  Links Bridges can help by incorporating your logo on the deck of your new bridge(s)

Sirocco Golf Club in Calgary, Alberta
Written by The Bridge Lady (Regina)

Bridge Renewal

This bridge story is about what we consider to be one of the most important innovations that will impact on what we can offer for golf courses, municipalities and other organizations with bridges over the next few years.  It is about how we have developed a method to manufacture a simple fiberglass ‘skin’ (in a wood or other finish) to make old bridges ‘new’ and extend their lives by decades in some cases.

We have to give credit where it is due and acknowledge that this innovation was developed to respond to needs identified by some wonderful people at the Sirocco Golf Club in Calgary, Alberta.  They were the first to push us in this direction.  We first heard from Dean Clarke the Superintendent at Sirocco and later from Tom Ellison the General Manager at Sirocco.

They identified that they had 9 bridges that were still OK but going relatively fast.  The substructures were fine but the decks were on the verge of needing replacement.  Working together, we came up with the idea of smoothing the decks to the point where we could bond and seal a thin, custom-manufactured fiberglass skin (in a wood finish) to the existing decks.  The process also involves sealing the joints of the ‘skins’ – which were made in sections to custom-fit over the entire deck.

This achieves a number of really important things:

  • The bridge looks ‘new’. Everything you can see is in fact new and the remainder is hidden.

  • The deck is now a low-maintenance, long-lasting fiberglass surface.

  • The deck and substructure are now sealed from any further moisture or UV exposure or penetration. The deterioration of the substructure will now virtually stop.

RenewalSirocco Golf Club in Calgary, Alberta

Pre & post coating shows the dramatic difference between the ‘before’ and ‘after’.

We are now working with the Sirocco team to complete the process on their remaining bridges.   At the same time, we are extended the offer for this product and service to the broader market as our research tells us that there is substantial potential for this to be a huge benefit to many of our customers to allow them to save a lot of money.

 

Carlteon Place
Written by The Bridge Lady (Regina)

In a hurry? What could go wrong?

This bridge story is a tribute to the determination of Links Bridges’ Installation team and as well to the precision of our Manufacturing team.  Without both of these, this story would read differently.

Links Bridges was contracted by a public housing organization to provide a replacement for a bridge that connected a parking lot to the 2nd floor entrance of a multi-unit housing building.

The key to success, aside from providing a great, long-lasting, low-maintenance bridge, was to minimize the down-time between bridge removal and bridge replacement.  The bridge was a key entrance and egress for the residents who would suffer major inconvenience if they lost use of the bridge for more than a day.

It was determined, based on historical engineering data, that the existing foundations could be re-used.  Links Bridges was supplying a fiberglass bridge which was considerably lighter than the existing steel bridge/concrete deck previously installed.  It was also important to fit the bridge perfectly into an existing building alcove so that building structures were not impacted and the interior floor/deck interface were on the exact same level.

rotten wood

Existing Steel Bridge – 40’ long

The bridge was made and completely assembled so that it could be installed in 1 piece to minimize down time between bridges.  The installation date was set and equipment and personnel scheduled to come in to remove and demolish the existing bridge.  The plan was for ‘same-day’ removal and installation.

As it turned out, events affected plans.  The scheduled day turned out to the coldest day of the winter and a heavy snowfall made things even more difficult.  Our hardy crew would not be deterred and work proceeded.

The real problem happened when the old bridge was lifted out, we discovered damage to one of the concrete footings.  The damage was such that the bearing points for the new bridge were compromised.

Carlteon Place

We quickly got the Engineering Team involved and they designed a solution that involved anchoring steel angles into the (uncompromised) sides of the foundations to provide a new bearing surface for the bridge beams.  Our daylight hours were quickly disappearing and lifting a 40’ bridge into a tight space in dark, snowing, sub-zero conditions is never a good plan.  Besides, we still needed to locate a steel fabricator who would be willing to stop what they were doing and cut some angle steel to the sizes that were required.

With a bit of luck, charm and determination, we managed to get the steel that same night.  Throughout the next morning and afternoon our hardy crew suffered through extreme conditions to get these installed to provide a bearing platform for our bridge beams.  With daylight quickly fading, our crane started to lift the bridge into place.

Thanks to the precision work of our manufacturing team, the bridge was a perfect fit for the tight space.  Within an hour the bridge was anchored and ready for use.  This important access for the building residents was restored.

This picture was taken the morning after installation.  Snow and sub-zero temperatures made things a little more difficult.

GIS2017
Written by The Bridge Lady (Regina)

“Inside The Ropes” at Golf Industry Show (GIS2017)

Links Bridges is pleased to announce a partnership with the 2017 Golf Industry Show – (GIS2017).

This year’s GIS is in Orange County Convention Center in Orlando, Florida from February 4 to 9.

A new feature at the 2017 GIS is ‘Inside the Ropes’.  The Golf Course Builders Association of America (GCBAA) and other sponsors are teaming with GIS to create a 9,000 square foot area featuring Golf Course amenities.  Links Bridges is one of the key sponsors.

‘Inside the Ropes’ is a must-see at the 2017 GIS.  Links Bridges will provide an actual golf course bridge ‘Inside the Ropes’.  The bridge will be Links Bridges’ ‘Woody’ model – our most popular golf course bridge.  The ‘Woody” is made of 100% fiberglass and has a very authentic wood finish.

 

This is a unique opportunity for Golf Course Operators to check out the look and feel of a Fiberglass Golf Course bridge.   Wood bridges rot, steel bridges rust – both require maintenance.  Fiberglass bridges outlast all other bridges.  They  require no maintenance and retain their natural looks for decades.

Be sure to visit ‘Inside the Ropes’ and come see Links Bridges at Booth # 1612 at the 2017 GIS in Orlando.

The Wood bridge at GIS2017 is 15 feet by 6 feet with ramp in both sides. Would you like to take it home with you?

 

 

Written by The Bridge Lady (Regina)

Why Bridges are Vital to Municipalities

According to Indigenous and Municipal Relations, the Province of Manitoba recently contributed $1.0 million to the Municipal Bridge Program to support communities in revitalizing their local pedestrian, commuter and public bridges and structures. The program requires a detailed project/bridge design, including each phase of the construction and its associated costs. It also requires that all this information is prepared and approved by a professional engineer who has ample experience in municipal bridge design and bridge engineering for municipalities.

 

Meanwhile, in Alberta, the AAMC’s agrees that “rural roads and bridges are not only vital to local communities, but serve as important arteries to help Alberta’s economy grow”.

 

Finally, in April 2016, right here in Ontario, the Government of Ontario delivered $20 million dollars to municipalities across the province to make road and bridges safer. This project, which runs through until 2017, was designed to “make roads and bridges safer, create economic growth and create or sustain jobs”.

 

The value of high quality, high performing and long-lasting municipal bridges is priceless. In fact, the majority of rural municipality expenses is spent on managing transportation infrastructure, like bridge revitalization and road construction. Why is it that  bridges so important to the economy of Canada’s municipalities?

 

  • Bridges serve the oil and gas, forestry and agricultural industries by providing access points to our countries’ most prized natural resources
  • As bridges age, some municipalities are forced to close roads and primary access points through communities due to the weight restrictions or cost of maintaining bridges.
  • Bridges in municipalities provide rural communities a gateway to major highways, tourism centres and primary health, education and recreation facilities.

 

Wherever your municipality is located, the construction of solid, durable, sustainable and environmental friendly bridges is essential. Municipal bridges do not need to cost an arm and a leg to your municipality either. The team at Links Bridges has decades of experience engineering the highest quality of municipal bridges.

 

We offer golf course bridges, residential bridges, park and trail bridges and enclosed bridges or building connectors. Our specialties include stone bridges, wood bridges, composite bridges, limestone bridges, steel bridges, metal bridges, HyBridge bridges, FRP bridges and aluminum bridges. We are also known as custom bridge builders who design, produce and maintain custom golf course bridges, custom park and trail bridges as well as custom residential bridges.

Our design capabilities include arched bridges, flat bridges, Geodesic frame bridges, foot bridges and tunnel style or enclosed bridges.

 

Due to the quality of our work and our unsurpassed customer service, Links Bridges is known as a top builder for golf course bridges, residential bridges or park & trail bridges in the USA and  Canada. We are 100% committed to any project we are involved in and stand behind all our designs and products. If you and your municipality are ready to invest back into the community with highest quality bridges, contact our team today at info@linksbridges.com or by phone at 1.888.444.0277. We would be honoured to serve all your bridge needs.

Links Bridges
Written by The Bridge Lady (Regina)

Restore Your Bridge Back to Life

We live in a disposable era, where the moment things break we either leave them that way (and promise we will fix them next weekend) or we replace them entirely, scrapping otherwise functional materials in exchange for a quick fix. Our mission at Links Bridges is to save our customers their time, their money, and their sanity. We have created a line of sustainable, eco-friendly bridges for municipalities, golf courses, and residences that don’t need to be fixed or replaced every few years. Additionally, we strive to replace the wastefulness in the landscaping industry by encouraging and providing services to accommodate bridge restoration and renewal.

With Links Bridges bridge restoration, our clients get to experience both an aesthetic and functional ‘new’ bridge at a fraction of the cost. Here is how:

First, consider that any bridge has 3 main components:

  1. Foundations/Abutments
  2. Beams
  3. Deck/Rails

It is often the case that the foundations and beams are still in great shape long after the deck has deteriorated.  This is particularly true for steel beam/wood deck bridges.

Our team of expert bridge designers and installers have perfected the art of bridge restoration, whereby, rather than replace the entire bridge when the deck needs replacement, Links Bridges can custom fabricate a new FRP deck.  Done properly, it can provide all of the benefits – including the look – of an entirely ‘new’ bridge. The best part is that this can all happen at a fraction of the cost of a new bridge.

The Links Bridges crew recently worked with the Sirocco Golf Club in Alberta on a successful restoration project.  The pictures below show the result.

Before:

links1

 

After:

links2

 

If your municipality, residence, or golf course has an older bridge that could use some tender love and care, contact our bridge experts at Links Bridges today for a free consultation on how to restore and revitalize your bridge. Whether your bridge runs through a golf course, a park, a trail, your backyard or otherwise, we can help bring it back to life. Contact us at info@linksbridges.com or call us at 888-444-0277.

Written by The Bridge Lady (Regina)

Restore Your Bridge Back to Life

We live in a disposable era, where the moment things break we either leave them that way (and promise we will fix them next weekend) or we replace them entirely, scrapping otherwise functional materials in exchange for a quick fix. Our mission at Links Bridges is to save our customers their time, their money and their sanity. We have created a line of sustainable, eco-friendly bridges to municipalities, golf courses and residences that don’t need to be fixed or replaced every few years. Additionally, we strive to replace the wastefulness in the landscaping industry by encouraging and providing services to accommodate bridge restoration and renewal.

With Links Bridges bridge restoration, our clients get to experience both an aesthetic and functional ‘new’ bridge at a fraction of the cost. Here is how:

First, consider that any bridge has 3 main components:

Foundations/Abutments

Beams

Deck/Rail

 

It is often the case that the foundations and beams are still in great shape long after the deck has deteriorated. This is particularly true for steel beam/wood deck bridges.

Our team of expert bridge designers and installers have perfected the art of bridge restoration, whereby, rather than replace the entire bridge when the deck needs replacement, Links Bridges can custom fabricate a new FRP deck. Done properly, it can provide all of the benefits – including the look – of an entirely ‘new’ bridge. The best part is that this can all happen at a fraction of the cost of a new bridge.

The Links Bridges crew recently worked with the Sirocco Golf Club in Alberta on a successful restoration project. The pictures below show the result.

If your municipality, residence or golf course has an older bridge that could use some tender love and care, contact our bridge experts at Links Bridges today for a free consultation on how to restore and revitalize your bridge. Whether your bridge runs through a golf course, a park, a trail, your backyard or otherwise, we can help bring it back to life. Contact us at info@linksbridges.com or call us at 888-444-0277.

Written by The Bridge Lady (Regina)

The Golf Inc Strategies Summit

All about the The Golf Inc Strategies Summit 2016

The team at Links Bridges is pleased to be a part of this weekend’s Golf Inc Strategies Summit. The summit is located at the breathtaking Omni Barton Creek Resort & Spa in Austin, Texas. Regina, our very own Bridge Lady, has travelled all the way to Texas, with her camera and questions in hand as she records her meetings with many of the golf industries greatest influencers, aficionados and players.

 

Meeting New Friends

We were honored to meet with Marko Kaldoja from Pärnu Bay Golf Links who represents two golf courses and describes the Omni Barton Golf Course as “fantastic…with really great views” and is eager to “hear great ideas, share some knowledge and learn a thing or two that we can implement back home”. His courses have concrete bridges and is eager to meet with Regina to learn more about Links Bridges’ unique and sustainable fiberglass bridges.

 

Chris Karamitsos is from Tampa, Florida of Millichap National Golf Resort Properties Group. When asked why he is here he tells me his hope is to “meet with some industry professionals and tell them about what is going on with the golf transaction market”.

 

Lessons from the Keynote Speakers

On day two, we enjoyed the opening Keynote presentation about predicting Golf’s Future with Eric Affeldt, the CEO of ClubCorp, Dana Garmany, the CEO of Troon (who teaches us all the tricks of the trade when it comes to golf course management) Peter Hill, the Chairman & CEO of Billy Casper and Jim Hinckley, the CEO of American Golf (who knows the industry inside and out as a reputable executive in the course management and ownership industry).

Here are some of our favorite panelist insights and predictions that they presented when they were asked the burning question at this year’s Summit:  “What would you say is going to happen here in the next five years?”

  • The population playing golf will remain stable and people will have much easier access to golf courses and resorts with the varying technological advancements in the industry.
  • The consumer will have more and more choices on where to play golf, how to set up your tee times (online and offline) and the consumer can make decisions more last minute than in the past.
  • Food and Beverage services, special services are becoming more important to each course
  • It is changing from a mere athletic endeavor to an entire experience.
  • Initiations fees will remain low, as people are hesitant to spend a lot of money right now.
  • In the last six months, corporate travel has reached an all-time low, and this means there may be a decrease in corporate related golf travel in the near future.

With a schedule filled to the brim with inspirational speakers, educational sessions and networking events, we expect to learn. To stay up to date on our video blog updates from Regina, Like Us On Facebook. Learn more about the Golf Inc Strategies Summit online at http://www.golfincmagazine.com/strategies-summit/

 

Here are some photos from the summit:

img_0756 img_0755  14352069_1791158157833016_5036938371115827847_o 14362445_1791159927832839_6107033060271912721_o 14372418_1791159497832882_3839583747312855392_o14322633_1790690874546411_4938748186894254563_n

 

 

Save

1 2